Rooftop solar installation in Vadodara
UVR Green Energies (UVR TECHSOL PRIVATE LIMITED) designs and installs rooftop solar from its Vadodara office and serves sites across India.
Eligible homes can use the central PM Surya Ghar subsidy: ₹30,000 per kW for the first 2 kW, capped at ₹78,000 from 3 kW. Gujarat homes up to 2.18 kWp also get extra state DBT after commissioning (10% of the MNRE benchmark as your share, 5% for SC/ST).
How a project moves
- Free professional site survey — Our engineers assess roof area, shading, structure and electrical setup at no cost.
- System design & subsidy filing — System sizing for bill and roof, then PM Surya Ghar application and DISCOM paperwork.
- Installation in 4–5 working days — HDGI structures, certified bifacial modules, cabling and earthing installed by UVR crews once approvals and materials are ready.
- Net-metering & handover — Bi-directional meter commissioning, monitoring setup and 5-year workmanship warranty.
Frequently asked questions
How does the PM Surya Ghar Muft Bijli Yojana subsidy system work?
The PM Surya Ghar: Muft Bijli Yojana provides Central Financial Assistance for eligible residential rooftop solar. The amount depends on installed capacity and MNRE guidelines (₹30,000 for the first kW, ₹60,000 at 2 kW, and a maximum of ₹78,000 for systems of 3 kW and above). UVR Green Energies manages the full process — application, documentation, installation and subsidy support.
What is net metering and how does it reduce my bill?
Net metering lets the excess electricity your solar system generates be exported to the DISCOM grid and adjusted against what you consume, reducing your monthly bill. It is governed by your state DISCOM's regulations.
How long does the entire solar installation and approval timeline take?
Once approvals and materials are ready, installation typically completes within 4–5 working days. The overall timeline, including approvals and net-metering, depends on DISCOM processing and site readiness. It begins with a free professional site survey by our engineers, followed by DISCOM approvals, mounting and commissioning.
What makes UVR N-Type bifacial panels better than traditional ones?
Bifacial N-Type TOPCon panels offer higher efficiency, lower degradation, better temperature performance and more generation than conventional Mono PERC — delivering superior long-term performance and higher lifetime savings.
How do I clean and maintain the solar system?
Solar systems need minimal maintenance — periodic cleaning, visual inspections and routine health checks. UVR provides comprehensive after-sales support and optional AMC services.
What happens to my solar system during a power cut?
A standard grid-connected system automatically shuts down during an outage for safety (anti-islanding). Backup during outages needs a battery/hybrid system, which UVR can provide on request.
Latest guides
- Net Metering in Indore: MPPKVVCL Steps and Timeline — Indore homes sit on MPPKVVCL, Madhya Pradesh’s West DISCOM. Net metering follows MPERC, not Gujarat’s GERC rules. Here is the national-portal path, papers, the 15-day clock for ≤10 kW, and how surplus is settled — with no invented buyback rate. (Learn · 7 min read · )
- Rooftop Solar in Anand: MGVCL, Subsidy and Sizing Guide — Anand town, Vallabh Vidyanagar and nearby villages sit on MGVCL Anand Circle. CFA is the national portal. Extra Gujarat state DBT, if you qualify, is the same 22 October 2026 GR as Vadodara. (Learn · 7 min read · )
- Gujarat Drops Connectivity Agreement for PM Surya Ghar — GERC Notification 10 of 2025 removes the extra connectivity signature for PM Surya Ghar rooftop plants. You are still bound by the net-metering regulations. (Learn · 7 min read · )
- Housing Society Solar Subsidy in Gujarat: GHS and RWA — A Gujarat housing society’s common-meter plant uses a different CFA table from a bungalow. ₹18,000 per eligible kW, a 3 kW-per-house ceiling, and a small connectivity waiver if the plant stays at 6 kW. (Compare · 8 min read · )
- PM Surya Ghar Application Status: What Each Stage Means — Decode Track Details on the national portal. Each stage has an owner. Gujarat’s extra state DBT is a later box, not the same clock as CFA. (Compare · 7 min read · )