Ahmedabad Net Metering & Tariffs: Torrent Power vs UGVCL

By UVR Green Energies Team · Published · 10 min read · Net Metering

Ahmedabad rooftop solar and Torrent Power net-metering context, UVR Green Energies

Ahmedabad rooftop solar falls under two different distribution licensees — Torrent Power Limited in its city licence area and Uttar Gujarat Vij Company Ltd. (UGVCL) on parts of the outskirts and district. While both operate under the…

The short answer

Ahmedabad systems commissioned on or after 30 October 2026 follow GERC DRES Regulations, 2026. Residential Torrent Power or UGVCL consumers get 100% billing-cycle export adjustment, zero banking charges, and leftover surplus deemed purchased at ₹2.25 per kWh, or such rate as GERC specifies. Systems up to 6 kW incur no distribution strengthening fee. Read the bill header, not the pin code, to confirm the licensee.

Key takeaways

Ahmedabad net metering under Torrent Power and UGVCL

Ahmedabad rooftop solar falls under two different distribution licensees — Torrent Power Limited in its city licence area and Uttar Gujarat Vij Company Ltd. (UGVCL) on parts of the outskirts and district. While both operate under the Gujarat Electricity Regulatory Commission's (GERC) newly notified DRES Regulations, 2026, their FY 2026-27 tariff slabs, fixed charges, and net-metering fee estimates differ.

The short answer

In Ahmedabad, net metering for new systems commissioned on or after 30 October 2026 follows the GERC Grid Interactive Distributed Renewable Energy Sources (DRES) Regulations, 2026 (Notification No. 11 of 2026). Residential consumers on either Torrent Power or UGVCL receive 100% billing-cycle adjustment of exported units against imports with zero banking charges, and leftover surplus is deemed purchased at ₹2.25 per kWh (or such rate as GERC specifies), with year-end credit balances settled into the consumer's bank account within 30 days. Systems up to 6 kW incur no distribution system strengthening fee. Read the bill header — not the pin code — to confirm whether your roof is a Torrent Power or UGVCL file.

Key takeaways

Two Ahmedabad bills, two different tariff tables

Picture two homeowners comparing summer bills (a hypothetical example): one lives in Satellite with a Torrent Power bill, and the other lives in a developing pocket on the western outskirts with an UGVCL bill. Both ask whether Gujarat's net-metering maths works the same way across the city.

Short answer: the state regulator (GERC) writes one set of net-metering rules for both, but the utility printed on your electricity bill sets your monthly tariff slabs, fixed charges, and connection-estimate paperwork. If you already read our PM Surya Ghar in Ahmedabad: Torrent Power Guide for the subsidy application workflow, this guide compares the metering rules, tariffs, and sizing maths between Torrent Power and UGVCL.

What your bill header showsDistribution licenseeGoverning FY 2026-27 tariff orderWho inspects & meters
Torrent Power LimitedTorrent Power (TPL-D Ahmedabad)GERC Case No. 2585 of 2025 (25 Mar 2026)Torrent Power Ahmedabad
Uttar Gujarat Vij Co. Ltd. (UGVCL)UGVCL (state-owned DISCOM)GERC State DISCOM Tariff Schedule w.e.f. 01.04.2026Local UGVCL sub-division

If your bill header is ambiguous, photograph the top section before starting an application. Do not rely on a municipal ward name or a neighbour's pin code.

What changed under GERC DRES Regulations 2026

On 30 October 2026, GERC notified the Grid Interactive Distributed Renewable Energy Sources Regulations, 2026 (Notification No. 11 of 2026) in the Gujarat Government Gazette Extraordinary. Under Regulation 1.4 and Regulation 4.1, it repeals the 2016 net-metering regulations for systems commissioned on or after notification, while systems commissioned earlier stay on their existing regulations and agreements.

For an Ahmedabad homeowner installing rooftop solar now, here is what Regulation 4.3, 6.2, 6.4, and 9.1 set out:

  1. Capacity range (Reg 4.3): Residential net metering is allowed from 1 kW AC up to 1,000 kW AC (1,250 kWp DC), aligned with GERC Supply Code voltage levels.
  2. Deemed feasibility up to 10 kW (Reg 6.2): Applications up to 10 kW that are complete in all respects are deemed accepted without a separate technical feasibility study.
  3. 100% billing-cycle set-off and zero banking charges (Reg 9.1.5): For residential consumers, the entire exported energy during a billing cycle offsets energy drawn from the grid in that cycle, with no banking charges.
  4. ₹2.25/kWh surplus settlement (Reg 9.1.5): Any leftover residential surplus after adjustment is treated as a deemed purchase by the DISCOM at ₹2.25 per kWh, or such rate as GERC specifies from time to time. Any credit balance standing at the end of the financial year is deposited into the consumer's designated bank account within 30 days.
  5. Fixed charges remain payable (Reg 9.1.9): Even when net energy drops to zero in a cycle, monthly fixed charges, electricity duty, and applicable levies stay on the bill.

Note for earlier systems: Homes commissioned before the 30 October 2026 Gazette notification remain governed by the earlier 2016 regulations and their existing interconnection agreements. Check the commissioning date on your utility letter.

Torrent Power vs UGVCL: FY 2026-27 residential tariffs compared

Because net metering reduces the grid units you buy, the rupees saved per solar unit depend directly on which tariff slabs you avoid. Both utilities retained their core residential (RGP) rates for FY 2026-27, but their slab cut-offs and fixed-charge structures differ.

Tariff component (FY 2026-27)Torrent Power Ahmedabad (RGP, non-BPL)UGVCL Urban (RGP, non-BPL post-paid)
Monthly fixed chargePhase-based monthly fixed charge (1φ / 3φ) per GERC Case No. 2585 of 2025 (confirm current amounts on your Torrent bill)₹15 (≤2 kW) / ₹25 (>2–4 kW) / ₹45 (>4–6 kW) / ₹70 (>6 kW)
Energy charge3 energy slabs per GERC Case No. 2585 of 2025 (confirm current paise/unit slabs on your Torrent bill)First 50 units: 305 paise/unit; next 50 (51–100): 350 paise/unit; next 150 (101–250): 415 paise/unit; above 250 units: 520 paise/unit
FPPPA & electricity dutyExtra, as notifiedExtra, as notified
Proposed regulatory chargeNot approved by GERC (Case 2585/2025)Not applicable

Sources: GERC Order in Case No. 2585 of 2025 for TPL-D (A), 25 March 2026 and GERC Tariff Schedule for DGVCL, MGVCL, PGVCL & UGVCL w.e.f. 01.04.2026. UGVCL also offers lower pre-paid energy charges (296 / 340 / 403 / 504 paise) when a positive smart-meter balance is maintained.

What this means for sizing: On both utilities, households in upper slabs pay retail energy rates well above the ₹2.25/kWh (or such rate as GERC specifies) surplus export rate (plus FPPPA and duty). Because surplus exports earn less than the upper retail slab, sizing a system close to your actual 12-month unit average generally yields stronger bill reductions than oversizing the terrace.

Connectivity fees, waivers and the 6 kW rule

Paperwork charges depend on system size and whether a state waiver applies to your residential category:

How much energy an Ahmedabad roof produces — and rough sizing

According to the World Bank / Solargis Global Solar Atlas at Ahmedabad coordinates (23.0225, 72.5714), modelled long-term photovoltaic output (PVOUT) is roughly 1,701 kWh per kWp per year at an optimum 26° tilt, peaking in March–May and dipping during July–August monsoon clouds. Real rooftop generation is lower wherever parapets, water tanks, dust, or tilt constraints interfere.

For conservative residential planning, UVR uses 126 units per kW per month and roughly 70 sq ft of shadow-free roof per kW (indicative planning benchmarks, not a generation guarantee).

Quick math (illustrative rate-list estimates, not a quotation):

Compare the 2 kW vs 3 kW trade-off in 2 kW vs 3 kW Solar in Gujarat and explore PM Surya Ghar eligibility rules before locking your capacity.

Hinglish note: Ahmedabad mein Torrent Power aur UGVCL dono par GERC ke 2026 net-metering niyam laagu hain — farq sirf aapke bijli bill ke tariff slab aur DISCOM estimate ka hai.

Next step

If you are in Ahmedabad or Gandhinagar, WhatsApp a clear photo of your latest Torrent Power or UGVCL bill to +91 96248 66799 (or call +91 96248 66799) or write to info@uvrgreenenergies.com via contact to book a site survey. UVR Green Energies surveys from Bhayli, Vadodara, checks shadow and sanctioned load against your 12-month units, and sizes the plant cleanly — without oversizing into surplus-export territory.

Frequently asked questions

Does Torrent Power Ahmedabad pay ₹2.25 per unit for surplus solar power?

Yes, for residential net-metering systems commissioned on or after 30 October 2026 under GERC DRES Regulations, 2026 (Regulation 9.1.5), any leftover residential surplus after billing-cycle set-off is deemed purchased at ₹2.25 per kWh (or such rate as GERC specifies from time to time), with year-end credit balances deposited to your bank account within 30 days. Systems commissioned before that Gazette notification remain on the earlier 2016/2022 terms.

Is UGVCL net metering different from Torrent Power in Ahmedabad?

Both follow the exact same GERC DRES Regulations, 2026 for net metering, 100% residential export adjustment, zero banking charges, and the 6 kW system-strengthening threshold. What differs is your FY 2026-27 retail tariff (UGVCL's 305–520 paise/unit slabs and load-banded fixed charges vs Torrent's phase-based fixed charges and three energy slabs — confirm current paise/unit rates on your Torrent bill) and the utility office issuing your connection estimate.

Can an Ahmedabad shop or office use the same residential net-metering rules?

No. Under GERC DRES Regulations, 2026 (Regulation 9.1.5), non-residential net-metering consumers can adjust exported energy only up to 30% of total grid energy drawn during that billing cycle, pay applicable banking charges, and forfeit exports beyond that 30% limit. Non-residential consumers also receive no PM Surya Ghar central subsidy.

How much solar output can a 3 kW rooftop plant generate in Ahmedabad?

Modelled Global Solar Atlas data for Ahmedabad (23.0225, 72.5714) indicates roughly 1,701 kWh/kWp/year under ideal unshaded tilt conditions, while UVR uses a conservative planning benchmark of 126 units/kW/month (~378 units/month for 3 kW). Actual generation depends on roof orientation, monsoon cloud cover, dust, and shading — these figures are planning estimates, not a guarantee.

Do I need to pay extra system strengthening charges for a 5 kW plant in Ahmedabad?

No. Under GERC DRES Regulations, 2026 (Regulation 6.4), distribution network strengthening costs for aggregate DRES capacity up to 6 kW are absorbed into the utility's Annual Revenue Requirement. Strengthening charges (25% of approved per-kW LT load-release charges) apply only to capacity exceeding 6 kW.

Sources

  1. GERC (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026 — Notification No. 11 of 2026, Gujarat Government Gazette Extraordinary (30 October 2026)
  2. GERC Tariff Order for Torrent Power Limited – Distribution (Ahmedabad), Case No. 2585 of 2025 (25 March 2026)
  3. GERC Tariff Schedule for DGVCL, MGVCL, PGVCL & UGVCL w.e.f. 01.04.2026 (March 2026)
  4. Torrent Power — Distribution Licence Areas
  5. Torrent Power — Ahmedabad Solar Net Metering Estimate Charges
  6. GUVNL — PM Surya Ghar Estimate Charges for State DISCOMs (15 February 2024, MGVCL host)
  7. Global Solar Atlas — Ahmedabad Long-Term Photovoltaic Power Potential (23.0225, 72.5714)
  8. MNRE — Operational Guidelines for CFA to Residential Consumers under PM Surya Ghar (Oct 2026 copy)

Frequently asked questions

Does Torrent Power Ahmedabad pay ₹2.25 per unit for surplus solar power?

Yes, for residential net-metering systems commissioned on or after 30 October 2026 under GERC DRES Regulations, 2026 (Regulation 9.1.5), any leftover residential surplus after billing-cycle set-off is deemed purchased at ₹2.25 per kWh (or such rate as GERC specifies from time to time), with year-end credit balances deposited to your bank account within 30 days. Systems commissioned before that Gazette notification remain on the earlier 2016/2022 terms.

Is UGVCL net metering different from Torrent Power in Ahmedabad?

Both follow the exact same GERC DRES Regulations, 2026 for net metering, 100% residential export adjustment, zero banking charges, and the 6 kW system-strengthening threshold. What differs is your FY 2026-27 retail tariff (UGVCL's 305–520 paise/unit slabs and load-banded fixed charges vs Torrent's phase-based fixed charges and three energy slabs — confirm current paise/unit rates on your Torrent bill) and the utility office issuing your connection estimate.

Can an Ahmedabad shop or office use the same residential net-metering rules?

No. Under GERC DRES Regulations, 2026 (Regulation 9.1.5), non-residential net-metering consumers can adjust exported energy only up to 30% of total grid energy drawn during that billing cycle, pay applicable banking charges, and forfeit exports beyond that 30% limit. Non-residential consumers also receive no PM Surya Ghar central subsidy.

How much solar output can a 3 kW rooftop plant generate in Ahmedabad?

Modelled Global Solar Atlas data for Ahmedabad (23.0225, 72.5714) indicates roughly 1,701 kWh/kWp/year under ideal unshaded tilt conditions, while UVR uses a conservative planning benchmark of 126 units/kW/month (~378 units/month for 3 kW). Actual generation depends on roof orientation, monsoon cloud cover, dust, and shading — these figures are planning estimates, not a guarantee.

Do I need to pay extra system strengthening charges for a 5 kW plant in Ahmedabad?

No. Under GERC DRES Regulations, 2026 (Regulation 6.4), distribution network strengthening costs for aggregate DRES capacity up to 6 kW are absorbed into the utility's Annual Revenue Requirement. Strengthening charges (25% of approved per-kW LT load-release charges) apply only to capacity exceeding 6 kW.

Sources

  1. GERC (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026 — Notification No. 11 of 2026, Gujarat Government Gazette Extraordinary (30 October 2026)
  2. GERC Tariff Order for Torrent Power Limited – Distribution (Ahmedabad), Case No. 2585 of 2025 (25 March 2026)
  3. GERC Tariff Schedule for DGVCL, MGVCL, PGVCL & UGVCL w.e.f. 01.04.2026 (March 2026)
  4. Torrent Power — Distribution Licence Areas
  5. Torrent Power — Ahmedabad Solar Net Metering Estimate Charges
  6. GUVNL — PM Surya Ghar Estimate Charges for State DISCOMs (15 February 2024, MGVCL host)
  7. Global Solar Atlas — Ahmedabad Long-Term Photovoltaic Power Potential (23.0225, 72.5714)
  8. MNRE — Operational Guidelines for CFA to Residential Consumers under PM Surya Ghar (Oct 2026 copy)

Keep reading