Sizing rooftop solar in Indore starts with your 12-month electricity units and sanctioned load — not a neighbour's quote from Gujarat. Before checking prices, confirm the utility name on your bill: Indore is served by MPPKVVCL (MP Paschim…
The short answer
UVR's national rate list uses an indicative ₹69,100 per kW before subsidy for Indore homes. PM Surya Ghar CFA is ₹30,000 (1 kW), ₹60,000 (2 kW), or up to ₹78,000 (3 kW and above), subject to eligibility. A 3 kW system is about ₹2,07,300 gross, or about ₹1,29,300 after up to ₹78,000 CFA — rate-list estimates, not a quotation. MPERC RG-39(II) 2024 caps plant size at 100% of sanctioned load.
Key takeaways
- MPPKVVCL vs MPMKVVCL: Indore homes are on MPPKVVCL (MP West DISCOM); MPMKVVCL covers Bhopal/Central MP. Both share MPERC's statewide LV-1.2 tariff slabs and net-metering regulations.
- No separate MP state top-up verified: Subsidy for Indore homes follows the national PIB/MNRE table (up to ₹78,000 at 3 kW+, subject to eligibility and DCR modules); no separate Madhya Pradesh state residential top-up was verified as active.
- Cost & subsidy path: UVR's national benchmark is ₹69,100/kW outside Gujarat. You pay the full installed amount upfront; CFA is credited after DISCOM inspection and a portal claim (or credited to your loan account first if you take a scheme loan).
- Fee waivers ≠ zero fee: Under MPERC's June 2026 amendment, PM Surya Ghar homes get the ₹1,000 processing fee and meter-testing fee waived, but the bidirectional meter procurement cost remains payable.
- Size to 12-month consumption, not surplus: Unadjusted credits settle annually (October–September) at MP's lowest discovered solar/wind bid tariff, not your retail slab, and fixed charges remain payable on imported units.
How to size rooftop solar in Indore
Sizing rooftop solar in Indore starts with your 12-month electricity units and sanctioned load — not a neighbour's quote from Gujarat. Before checking prices, confirm the utility name on your bill: Indore is served by MPPKVVCL (MP Paschim Kshetra Vidyut Vitaran Co. Ltd. — West DISCOM), not MPMKVVCL (Madhya Kshetra, which serves Bhopal and Gwalior), though both follow the exact same MPERC tariff order and net-metering rules.
The short answer
For Indore homes, UVR Green Energies' national rate list uses an indicative benchmark of ₹69,100 per kW before subsidy, and PM Surya Ghar central CFA adds ₹30,000 (1 kW), ₹60,000 (2 kW), or up to ₹78,000 (3 kW and above) when applied on pmsuryaghar.gov.in with DCR modules, subject to eligibility. On that sheet, a 3 kW system is estimated at about ₹2,07,300 gross (about ₹1,29,300 after up to ₹78,000 CFA) — rate-list estimates, not a quotation. Under MPERC's FY 2026-27 Tariff Order (Schedule LV-1.2), urban domestic tariffs reach 705–724 paise/unit above 150 units/month, while MPERC RG-39(II) 2024 caps plant size at 100% of your sanctioned load.
Key takeaways
- MPPKVVCL vs MPMKVVCL: Indore homes are on MPPKVVCL (MP West DISCOM); MPMKVVCL covers Bhopal/Central MP. Both share MPERC's statewide LV-1.2 tariff slabs and net-metering regulations.
- No separate MP state top-up verified: Subsidy for Indore homes follows the national PIB/MNRE table (up to ₹78,000 at 3 kW+, subject to eligibility and DCR modules); no separate Madhya Pradesh state residential top-up was verified as active.
- Cost & subsidy path: UVR's national benchmark is ₹69,100/kW outside Gujarat. You pay the full installed amount upfront; CFA is credited after DISCOM inspection and a portal claim (or credited to your loan account first if you take a scheme loan).
- Fee waivers ≠ zero fee: Under MPERC's June 2026 amendment, PM Surya Ghar homes get the ₹1,000 processing fee and meter-testing fee waived, but the bidirectional meter procurement cost remains payable.
- Size to 12-month consumption, not surplus: Unadjusted credits settle annually (October–September) at MP's lowest discovered solar/wind bid tariff, not your retail slab, and fixed charges remain payable on imported units.
MPPKVVCL vs MPMKVVCL: why the bill header matters
Many Indore homeowners search for "MPMKVVCL solar subsidy" when researching rooftop quotes. In Madhya Pradesh, electricity distribution is split across three state utilities: MPPKVVCL (West DISCOM, Indore/Ujjain), MPMKVVCL (Central DISCOM, Bhopal/Gwalior), and MPPKVVCL-East / MPPoKVVCL (East DISCOM, Jabalpur/Rewa).
The good news is that the Madhya Pradesh Electricity Regulatory Commission (MPERC) issues one unified Retail Supply Tariff Order and one statewide rooftop regulation — RG-39(II) of 2024, as amended on 18 June 2026. Still, your local MPPKVVCL zone office inspects your roof and installs the bidirectional meter, so keep your MPPKVVCL consumer number handy. For step-by-step metering paperwork, read our Indore MPPKVVCL Net Metering Guide.
FY 2026-27 Indore domestic electricity tariffs (Schedule LV-1.2)
To decide between 2 kW, 3 kW, or 5 kW in Indore, look at how MPERC's FY 2026-27 Tariff Order (Schedule LV-1.2, pp. 199–200) bills urban domestic consumption:
| Monthly consumption slab | Energy charge (telescopic, paise/unit) | Urban monthly fixed charge |
|---|---|---|
| Up to 50 units | 471 paise/unit | ₹81 per connection |
| 51 to 150 units | 567 paise/unit | ₹134 per connection |
| 151 to 300 units | 705 paise/unit | ₹30 per 0.1 kW load* |
| Above 300 units | 724 paise/unit | ₹30 per 0.1 kW load* |
*Note: Under Schedule LV-1.2, fixed charges above 150 units are calculated by treating every 15 units of monthly consumption (or part thereof) as 0.1 kW — for example, 350 units equals 2.4 kW. Electricity duty and FPPAS apply over and above these base rates.
Low-usage note (Atal Griha Jyoti Yojana): Households consuming up to 150 units a month in MP often receive state tariff relief under the Atal Griha Jyoti scheme (paying ₹100 for the first 100 units, per district administration scheme notes). If your monthly usage consistently stays below 150 units, your actual tariff savings from solar will be much smaller than for a 350+ unit AC household paying 705–724 paise/unit.
How much solar an Indore roof generates — and how to size it
Modelled data from the World Bank / Solargis Global Solar Atlas for Indore (22.7196, 75.8577) puts long-term potential (PVOUT) at roughly 1,606 kWh per kWp per year under optimum 25° tilt, while MPERC's own billing illustration in RG-39(II) Annexure-7 uses 4 units/kW/day.
For practical residential sizing, UVR uses 126 units per kW per month and roughly 70 sq ft of shadow-free roof per kW (MNRE's general FAQ budgets about 10–12 sq m per kWp). These are planning benchmarks, not a generation guarantee; monsoon months in Malwa reduce output, and shade from overhead tanks lowers yield.
| Typical 12-month MPPKVVCL average | Indicative system size | Approx. shadow-free roof area | Sanctioned load check (RG-39(II) Reg 4) |
|---|---|---|---|
| ~220–260 units/month | 2 kW | ~140 sq ft | Requires ≥ 2 kW sanctioned load |
| ~350–420 units/month | 3 kW | ~210 sq ft | Requires ≥ 3 kW sanctioned load |
| ~550–650 units/month | 5 kW | ~350 sq ft | Requires ≥ 5 kW sanctioned load |
Critical rule: Under MPERC RG-39(II) Regulation 4, your rooftop solar capacity cannot exceed your sanctioned load (minimum 1 kW, maximum 500 kW, and consumers with unpaid arrears are ineligible). If your Vijay Nagar or Palasia home has a 2 kW sanctioned load on paper but uses 400+ units in May, apply to MPPKVVCL for a load enhancement before ordering a 3 kW or 5 kW system.
Indore rooftop solar cost and PM Surya Ghar subsidy (2026)
Official agencies do not publish a fixed retail price list; the MNRE benchmark (₹50,000/kW for the first 2 kW and ₹45,000/kW above that) is solely a calculation formula for central subsidy. For outside-Gujarat cities including Indore, UVR's published national rate list uses an indicative benchmark of ₹69,100 per kW for standard on-grid installations (pre-subsidy, subject to site survey, roof height, structure type, and cable runs).
Central Financial Assistance (CFA) under PM Surya Ghar follows the general-state slab (PIB PRID 2042620):
| System capacity | Indicative gross estimate (@ ₹69,100/kW) | Central CFA (DCR required) | Indicative net estimate after CFA* |
|---|---|---|---|
| 1 kW | ~₹69,100 | ₹30,000 | ~₹39,100 |
| 2 kW | ~₹1,38,200 | ₹60,000 | ~₹78,200 |
| 3 kW | ~₹2,07,300 | up to ₹78,000 | ~₹1,29,300 |
| 5 kW | ~₹3,45,500 | up to ₹78,000 (capped at 3 kW) | ~₹2,67,500 |
*Rate-list estimates for illustration only, not a final quotation. No separate Madhya Pradesh state residential top-up is included.
Important payment, loan, and DCR rules:
- Pay upfront, credit later: You pay the full installed invoice to the registered vendor first; central CFA is credited only after MPPKVVCL inspection and portal approval. It is not an upfront booking discount.
- Loan path (MNRE Guidelines §6(s)): If you finance the plant with a concessional scheme loan (benchmarked at RBI repo + 50 bps up to 3 kW via Jan Samarth), CFA is credited to the loan account first to reduce principal.
- DCR modules mandatory: Any use of non-DCR panels makes the system ineligible for CFA (read our DCR vs Non-DCR guide).
- MPERC fee waivers vs meter cost: Under MPERC Petition 137/2025 (17 April 2026) and ARG-39(II)(i) (18 June 2026), PM Surya Ghar residential applicants get the ₹1,000 processing fee and meter-testing fee waived, with no separate paper agreement needed — however, the bidirectional meter procurement cost itself is not waived.
Why oversizing hurts in Indore (and what stays on the bill)
Under MPERC RG-39(II) Regulation 8A, net-metering exports offset imports month to month across an October–September settlement year. Unused credits at the end of September are settled by 15 November at the lowest solar or wind bid tariff discovered in Madhya Pradesh in the previous financial year, then reset to zero. Fixed charges also remain payable on imported units (Reg 8A(5)).
Because that year-end bid rate is far lower than the 705–724 paise/unit residential slab, oversizing your plant to earn "extra income" stretches the time it takes to recover your cost (which is always an estimate based on your consumption and tariff, never a guaranteed timeline or return). Use the PM Surya Ghar Subsidy Checker and read our Solar System Sizing Guide with your last 12 MPPKVVCL bills before choosing 2 kW vs 3 kW.
Hinglish note: Indore mein solar ka sahi size aapke 12 mahine ke MPPKVVCL units aur sanctioned load se tay hota hai — 3 kW se upar central subsidy ₹78,000 tak cap ho jaati hai (patrata aur DCR panels ki shartein lagu).
Next step
In Indore, WhatsApp a clear photo of your latest MPPKVVCL electricity bill to +91 97147 06799 (or call +91 97147 06799) or write to info@uvrgreenenergies.com via contact to book a free site survey. An engineer will verify roof space, shading, and your sanctioned load on solar in Indore before preparing an itemised proposal.
Frequently asked questions
Does Indore fall under MPMKVVCL or MPPKVVCL?
Indore is served by MPPKVVCL (MP Paschim Kshetra Vidyut Vitaran Co. Ltd. — West DISCOM). MPMKVVCL (Central DISCOM) serves Bhopal, Gwalior, and central Madhya Pradesh. Both utilities follow MPERC's unified FY 2026-27 tariff order and RG-39(II) net-metering regulations.
How much does a 3 kW rooftop solar system cost in Indore after subsidy?
Using UVR's national rate-list benchmark of ₹69,100/kW outside Gujarat, a 3 kW system works out to about ₹2,07,300 gross, or roughly ₹1,29,300 net after the up to ₹78,000 PM Surya Ghar central CFA (subject to eligibility and DCR modules). These are indicative rate-list estimates, not a binding quotation — site conditions, structure height, and cable length affect the final quote.
Is there any Madhya Pradesh state subsidy on top of the ₹78,000 central CFA?
No separate Madhya Pradesh state residential subsidy was verified for Indore homes. PM Surya Ghar central CFA (₹30,000/kW for the first 2 kW plus ₹18,000 for the 3rd kW, up to ₹78,000 subject to eligibility and DCR modules) is the verified subsidy table.
Can I install a 5 kW solar plant on a 3 kW MPPKVVCL sanctioned load?
No. Under MPERC RG-39(II) Regulation 4, a net-metered rooftop solar plant cannot exceed your sanctioned load. You must apply to MPPKVVCL to enhance your sanctioned load to at least 5 kW before installing a 5 kW plant.
Are net-metering fees completely free in Indore under PM Surya Ghar?
No. While MPERC's June 2026 amendment waived the ₹1,000 processing fee, meter-testing fee, and separate paper agreement for PM Surya Ghar applicants, MPERC's order in Petition 137/2025 explicitly held that the bidirectional meter procurement cost is a capital cost and remains payable.
Sources
- MPERC — ARR and Retail Supply Tariff Order for FY 2026-27 (Petition 140/2025, Schedule LV-1.2)
- MPERC — RG-39(II) of 2024: Grid Interactive Renewable Energy Systems Related Matters (Revision-II)
- MPERC — First Amendment ARG-39(II)(i) of 2026 (18 June 2026)
- MPERC — Petition 137/2025 Final Order (17 April 2026)
- MNRE — Operational Guidelines for CFA to Residential Consumers under PM Surya Ghar (Oct 2026 copy)
- PIB — PM Surya Ghar CFA Pattern (PRID 2042620)
- Global Solar Atlas — Indore Long-Term Photovoltaic Power Potential (22.7196, 75.8577)
- Dhar District Administration — Indira / Atal Griha Jyoti Yojana
Frequently asked questions
Does Indore fall under MPMKVVCL or MPPKVVCL?
Indore is served by MPPKVVCL (MP Paschim Kshetra Vidyut Vitaran Co. Ltd. — West DISCOM). MPMKVVCL (Central DISCOM) serves Bhopal, Gwalior, and central Madhya Pradesh. Both utilities follow MPERC's unified FY 2026-27 tariff order and RG-39(II) net-metering regulations.
How much does a 3 kW rooftop solar system cost in Indore after subsidy?
Using UVR's national rate-list benchmark of ₹69,100/kW outside Gujarat, a 3 kW system works out to about ₹2,07,300 gross, or roughly ₹1,29,300 net after the up to ₹78,000 PM Surya Ghar central CFA (subject to eligibility and DCR modules). These are indicative rate-list estimates, not a binding quotation — site conditions, structure height, and cable length affect the final quote.
Is there any Madhya Pradesh state subsidy on top of the ₹78,000 central CFA?
No separate Madhya Pradesh state residential subsidy was verified for Indore homes. PM Surya Ghar central CFA (₹30,000/kW for the first 2 kW plus ₹18,000 for the 3rd kW, up to ₹78,000 subject to eligibility and DCR modules) is the verified subsidy table.
Can I install a 5 kW solar plant on a 3 kW MPPKVVCL sanctioned load?
No. Under MPERC RG-39(II) Regulation 4, a net-metered rooftop solar plant cannot exceed your sanctioned load. You must apply to MPPKVVCL to enhance your sanctioned load to at least 5 kW before installing a 5 kW plant.
Are net-metering fees completely free in Indore under PM Surya Ghar?
No. While MPERC's June 2026 amendment waived the ₹1,000 processing fee, meter-testing fee, and separate paper agreement for PM Surya Ghar applicants, MPERC's order in Petition 137/2025 explicitly held that the bidirectional meter procurement cost is a capital cost and remains payable.
Sources
- MPERC — ARR and Retail Supply Tariff Order for FY 2026-27 (Petition 140/2025, Schedule LV-1.2)
- MPERC — RG-39(II) of 2024: Grid Interactive Renewable Energy Systems Related Matters (Revision-II)
- MPERC — First Amendment ARG-39(II)(i) of 2026 (18 June 2026)
- MPERC — Petition 137/2025 Final Order (17 April 2026)
- MNRE — Operational Guidelines for CFA to Residential Consumers under PM Surya Ghar (Oct 2026 copy)