Rooftop Solar in Greater Noida: NPCL, UP Subsidy and Sizing
By UVR Green Energies Team · Published · 7 min read · City Guides

Greater Noida homes sit on NPCL, not PVVNL. CFA is the national portal. Extra Uttar Pradesh state subsidy, if you qualify, is ₹15,000 per kW up to ₹30,000 — not Gujarat’s 2.18 kW GR.
The short answer
Rooftop solar in Greater Noida is an NPCL file under UPERC, not Gujarat’s GERC table. Homes on an LMV-1 bill use net metering. Apply on pmsuryaghar.gov.in with a registered vendor and DCR modules. CFA is ₹30,000 / ₹60,000 / ₹78,000. UPNEDA adds ₹15,000 per kW up to ₹30,000. Size to sanctioned load. UVR Green Energies surveys from Bhayli, Vadodara.
Key takeaways
- Greater Noida is NPCL. Noida city is often PVVNL. Read the bill, not the pin code.
- CFA: ₹30,000 / ₹60,000 / ₹78,000. UPNEDA state top-up is ₹15,000 per kW, capped at ₹30,000.
- UPERC net metering is for LMV-1 homes (and LMV-5). Shops typically sit on net billing and get no home CFA.
- Plant size cannot exceed 100% of sanctioned load. Leftover export at year-end pays ₹2 per unit, not your retail tariff.
- UVR’s national list is about ₹69,100 per kW. A 3 kW home nets about ₹99,300 after both subsidies on that sheet — confirm UPNEDA eligibility.
Two bills, one expressway
Imagine two cousins (a hypothetical pair) comparing May bills over chai. One lives in a villa off the Yamuna Expressway. The other is in a Greater Noida society flat with a lift lobby and a common terrace.
Both ask whether rooftop solar Greater Noida is a Gujarat-style file with MGVCL surplus rates.
Short answer: it is PM Surya Ghar on the national portal, inspected by NPCL, under UPERC rooftop rules. Extra Uttar Pradesh state support, if you qualify, is a UPNEDA top-up — not the 22 October 2026 Gujarat GR. UVR Green Energies surveys from Bhayli and does not treat Greater Noida as a foreign country.
City page: solar in Greater Noida. Sister city on a different regulator: net metering in Indore.
NPCL, not a Noida-city shortcut
Noida Power Company Ltd. supplies Greater Noida. NPCL’s rooftop solar page is the local desk for net metering and net billing.
| Place | Typical licensee | Home CFA |
|---|---|---|
| Greater Noida villa / bungalow | NPCL | National table + UPNEDA if eligible |
| Greater Noida society common load | NPCL | GHS table, not bungalow CFA |
| Noida city bill that says PVVNL | PVVNL | Same CFA table, different inspector |
| Shop or factory meter | Same paper, commercial category | No home CFA |
CFA does not change at the district border. Solar in Uttar Pradesh on an NPCL residential bill uses the same PIB table as a Vadodara home. The inspector, the fee list and the leftover-export rate do change.
What this Greater Noida guide is not
It is not a Gujarat surplus story. Do not copy MGVCL’s ₹2.25 onto an NPCL bill.
It is not a Noida-city PVVNL walkthrough. If the bill says PVVNL, this page is the wrong helpline even when the pin code looks familiar.
It is not commercial solar maths dressed as PM Surya Ghar. Warehouses and shops on non-domestic tariffs need a different conversation — commercial solar — and they are not ₹78,000 home CFA.
It is not an excuse to skip DCR. DCR vs non-DCR panels still gate subsidy on the national portal.
Central CFA plus the UPNEDA top-up
PIB sets CFA at ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW, with no extra CFA beyond 3 kW, so the cap is ₹78,000. Uttar Pradesh is not in the special-category column.
UPNEDA’s PM Surya Ghar booklet (1 August 2024) adds a state subsidy of ₹15,000 per kW for residential plants up to 2 kW, with no additional state amount between 2 kW and 3 kW. That is a ₹30,000 state cap on a 2 kW or 3 kW home.
| Size | Central CFA (PIB) | UPNEDA state (booklet) | Stack if both clear |
|---|---|---|---|
| 1 kW | ₹30,000 | ₹15,000 | ₹45,000 |
| 2 kW | ₹60,000 | ₹30,000 | ₹90,000 |
| 3 kW | ₹78,000 | ₹30,000 | ₹1,08,000 |
| Above 3 kW | ₹78,000 cap | ₹30,000 cap | No extra rupees for the extra kW |
UVR’s rate sheet uses the national on-grid benchmark of ₹69,100 per kW outside Gujarat, and a flat ₹30,000 Uttar Pradesh line on top of CFA. That flat line matches UPNEDA for 2 kW and above. Confirm state eligibility on UPNEDA when you apply.
You pay the vendor first. Central CFA and the state top-up are later credits, not a booking-invoice discount.
Use the PM Surya Ghar subsidy checker with Uttar Pradesh selected before you freeze 2 kW versus 3 kW.
Net metering in one minute
Think of the NPCL grid as a passbook for electricity.
NPCL’s rooftop page, reading UPERC, says net metering is for LMV-1 domestic (and LMV-5 agriculture) prosumers. Other categories typically sit on net billing / net feed-in, where import and export are priced separately.
- Daytime: panels feed the house first. Spare units export through the bidirectional meter.
- Night: panels stop. You import as usual.
- Month end: exports set off imports. You are billed on the difference, plus fixed charges that UPERC says still apply even when you hold credits.
That is net metering, not net billing and not gross metering. For hardware choices see on-grid vs off-grid vs hybrid.
UPERC’s RSPV Regulations, 2019, as amended, pay unused net-metering credits at ₹2 per kWh at the end of each settlement period, then reset the balance to zero. NPCL’s rooftop page treats that settlement period as the financial year.
Size, sanctioned load and the transformer
Under UPERC Regulation 5.1, peak rooftop capacity shall not exceed 100% of connected / contracted demand, and shall not be less than 1 kWp.
NPCL repeats the same cap: a 5 kW sanctioned load cannot take a 6 kWp plant until the load is augmented.
| Rule | What it means for a Greater Noida home |
|---|---|
| Minimum 1 kWp | Below that, this regulation’s product is not on offer |
| Not above sanctioned load | Size to the kW printed on the NPCL bill |
| LMV-1 for net metering | A shop meter is a different product |
| Distribution transformer | UPERC caps allowed rooftop on a DT at 75% of that transformer |
Steps from the NPCL bill to the net meter
MNRE’s operational guidelines say a residential consumer applies on the PM Surya Ghar National Portal with a valid DISCOM consumer number. NPCL then wants hard copies at its Knowledge Park-III office, as its rooftop page states.
- Residential NPCL bill — LMV-1, consumer number, name match for bank proof.
- Register on pmsuryaghar.gov.in — pillar explainer: what is PM Surya Ghar.
- Choose a portal-registered vendor (UVR Green Energies files from Bhayli). NPCL’s page also points subsidy files to UPNEDA-empanelled vendors.
- Install DCR after feasibility clears; vendor uploads geo-tagged evidence.
- NPCL inspects, interconnection agreement, bidirectional meter, portal approval.
- CFA after approval; state subsidy later if UPNEDA’s tests fit.
Hinglish: Greater Noida solar subsidy kaise apply kare = pehle national portal, phir NPCL inspection. Do not treat an old UPNEDA-only bookmark as the CFA file.
NPCL’s charges PDF lists, for connected load up to 50 kW, an application fee of ₹250 plus GST and a registration fee of ₹1,000 plus GST. Meter cost is extra. Labour is extra.
Villas, penthouses and housing societies
Many Greater Noida families live in apartments. A bungalow CFA file and a society file are not the same product.
PIB’s GHS/RWA line is ₹18,000 per kW for common facilities, including EV charging, up to 500 kW and 3 kW per house. UPNEDA’s booklet adds ₹15,000 per kW up to 2 kW on that GHS row.
The plant must sit on a dedicated common-facility connection. The RWA needs its own approval. See housing-society solar.
A penthouse with its own LMV-1 terrace can still be a home file. A third-floor flat that only “uses” the lift-room roof cannot.
Sizing Greater Noida roofs
Start from twelve months of NPCL units, not from a neighbour’s 5 kW near the expressway.
UVR uses 126 units/kW/month as planning yield before shade — indicative, not a guarantee on your terrace. Roof area planning is about 70 sq ft of shadow-free roof per kW.
| Bill pattern | Rough direction |
|---|---|
| ~200 units/month | Often a 2 kW candidate |
| ~350–450 units/month | 2–3 kW trade-off, watch sanctioned load |
| Shop or common-area meter | Not PM Surya Ghar home CFA |
Read what size solar system do I need with your own bill.
After install, keep every portal PDF and NPCL SMS. CFA follows DISCOM approval. The UPNEDA state line is a separate credit.
UVR in Bhayli — Greater Noida is on the list
Head office: 423, Vihav Trade Center, Vasna–Bhayli Canal Road, Bhayli, Vadodara 391410. Greater Noida is in the served-city list. Solar in Greater Noida, solar in Indore and solar in Gujarat are the same EPC, not a pin-code fence.
Next step
WhatsApp an NPCL Greater Noida bill to +91 95375 66799 or contact to book a free site survey. Homes: residential rooftop.
Frequently asked questions
How much solar subsidy can a Greater Noida home get in 2026?
Central CFA is ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW, capped at ₹78,000, as in PIB. UPNEDA’s booklet adds ₹15,000 per kW with no extra state amount above 2 kW, so the state cap is ₹30,000. A 3 kW home can stack ₹78,000 plus ₹30,000 if both layers clear. You pay the installer first; credits follow commissioning. DCR modules are required for CFA.
Which DISCOM handles rooftop solar in Greater Noida?
Noida Power Company Ltd. (NPCL) supplies Greater Noida. It inspects the plant and fits the bidirectional meter under UPERC’s rooftop regulations. CFA is still filed on pmsuryaghar.gov.in. If the bill says PVVNL, you are not on NPCL even if the pin code looks like Noida. UVR Green Energies surveys from Bhayli and lists Greater Noida as a service city.
Is Noida city the same as Greater Noida for solar?
No. Greater Noida’s licensee is NPCL. Much of Noida city sits on PVVNL. The CFA table does not change, but the inspector, the paper desk and the net-metering fee list do. NPCL’s rooftop page also asks for hard copies at Knowledge Park-III after the national-portal file. Read the utility name on the bill before you copy a neighbour’s WhatsApp checklist.
Can my Greater Noida apartment society install solar?
Yes, on a dedicated common-facility connection. PIB sets GHS/RWA CFA at ₹18,000 per kW for common facilities, including EV charging, up to 500 kW and 3 kW per house. UPNEDA’s booklet also lists a state line of ₹15,000 per kW up to 2 kW for GHS/RWA. The society needs its own approval. A flat without a terrace cannot collect bungalow CFA on the lift-room roof.
What fees does NPCL charge for net metering?
NPCL’s published charges sheet, citing UPERC, lists an application fee of ₹250 plus GST and a registration fee of ₹1,000 plus GST for connected load up to 50 kW. The bidirectional meter itself is extra. Labour is extra. These are DISCOM lines, not an UVR discount. Confirm the live estimate NPCL prints when you apply, because a later cost-data book can replace the 2019 figures.
Does UVR only install in Vadodara, not Greater Noida?
No. Head office is in Bhayli, Vadodara. Greater Noida is a listed city page on this site. UVR Green Energies also takes solar in Indore, Surat, Bharuch, Ahmedabad and other national sites. Distance from HQ is not an eligibility test for PM Surya Ghar. WhatsApp the latest NPCL bill to +91 95375 66799 to book a free site survey.
Sources
- NPCL — rooftop solar, net metering and net billing
- NPCL — net metering application, registration and meter charges
- UPERC RSPV Regulations, 2019 (with amendments through June 2025)
- UPNEDA — PM Surya Ghar Muft Bijli Yojana information booklet
- PIB: CFA pattern for PM Surya Ghar (₹30,000 / ₹18,000; no extra beyond 3 kW)
- PM Surya Ghar National Portal
- MNRE operational guidelines for CFA to residential consumers under PM Surya Ghar